In this post we ll explore the 5 key elements of your basement bathroom design.
Building basement bathroom raised floor.
There are some crucial points that you need to take into your consideration before building one as basement is located underneath the ground and for this reason it should be treated with extra care.
There was no headroom.
Building on the floor.
You ll need help with holding the wood together as you start to secure it and you ll need someone to help lift the wall into place.
Plus i will tell you the 3 things.
You supply the labor and the basement bathroom ideas.
If your basement floor is not level which most basement floors aren t building on the.
Provide a thermal break i e insulation.
Be able to dry out in the event of flooding.
Now i ve cut up the concrete floor had a plumber run pipes re filled with bagged concrete and leveled the cutout with self leveling cement.
You ll be working on finishing your basement framing electrical and so on then one day you ll start on your bathroom and you won t come out for like a month and half.
The bathroom floor was previously raised about 10 extra inches relative to the rest of the floor for drain pipes that were run above the slab.
Things you ll need nails 3 4 inch osb or plywood sheets 4 x 8 silicone caulk circular saw jig saw subfloor adhesive.
So instead of breaking concrete we built the floor up to accommodate the plumbing.
A contractor wants to build a raised floor for my bathroom basement that he is building for me instead of breaking the concrete.
This article will supply the know how.
Plumbers labor rates vary a lot by region but a basement bathroom cost would run between 1 200 to 2 000 for a pro job similar to the one shown here.
Essential points to consider for basement bathroom.
The raised drainage platform was a necessity because the main drain the big black one on the right in the first picture did not have a place where we could connect the bathroom drainage to the rest of the house s drainage.
Building basement bathroom is different from building the one you have in the ground floor.
Provide a flat level surface for the finish flooring.
If you re building each section on the floor i highly recommend having someone with you.
Is this a viable and safe.
The materials for the dwv system shown here cost about 250.
The plumbing would be underneath the floor.
Keep moisture at bay.